Installation and debugging of micro - screen hydraulic universal testing machine

    • Release time:2018-11-14 09:56:26
    • Views:3645

The installation and adjustment of micro - screen hydraulic universal testing machine is an important work. It is related to restoring the geometrical precision, the precision of indication and the service life of the machine. The work should therefore be carried out by professional staff.
The placement, installation, adjustment, watering and cementing of the test machine, connection of oil pipe, power connection, driving, test run and other work are carried out organically, and are related to each other, and each link should be taken seriously.
1. Installation conditions
The test machine should be installed in the room which is clean, dry, vibration-free and with uniform temperature, and enough maintenance space should be left around the test machine.
The main engine of the test machine shall be installed on the basis of concrete, and its size shall be determined according to the requirements of foundation drawings, wires, installation pipes and other devices. The upper plane of the foundation should be flat, straightened with a level gauge, and then installed on the testing machine after the foundation is dry.
2, installation,
2.1 the foundation engineering of the machine is constructed according to the foundation drawing.
2.2 initial alignment of the host
On the basis of the main engine, place the inclined iron and make the mounting bolt hole of the base coincide with the center of the base hole. Used in 2 groups in 4 locations.
Set the frame level in the center position above the work table (its precision is 0.05/1000) to adjust the host precision. Make it 0.1/1000.
2.3 casting and cementing of test machine foundation
2.3.1 testing machine precision alignment, the anchor nut with cement fixation, the pad iron pad underneath the stand firm, and cement base are all fill in the gap below to death, guarantee stand with good combination of cement base, prevent in use process due to vibration caused by the tester is not level, anchor nut after solid, cement dry before not tighten the anchor nut and start the machine (cement drying time is generally not less than 10-15 days). After the cement is completely dried, tighten the anchor nut and check the mounting accuracy of the test machine.
2.3.2 during the use of the test machine, due to the easy occurrence of looseness due to vibration, relevant parts should be fixed after the test machine has been used for some time.
2.4 to take over
When installing the oil pipe of the main engine, clean the oil pipe with kerosene first, and pay attention to whether the washer is complete at the joint. Oil cylinder pipe should be correctly taken over.
2.5 lubrication
The molybdenum disulfide grease can be applied on the lead screw to lubricate the lead screw and its mother. Molybdenum disulfide grease can be applied to avoid nibbling or death on sliding surface. The chain and sprocket shaft shall be regularly filled with thin grease.

濟(jì)南鉑鑒試驗(yàn)機(jī)

Copyright 2010-2017 siyuan. All Right Reserved

主站蜘蛛池模板: 国产二区在线播放 | 亚洲在线免费观看 | 亚洲视频一区二区 | 久久国产精品无码网站 | 直接看的av网站 | 久久国产精品一区二区 | av免费网站在线观看 | 国产精品久久久久久久午夜片 | 久久精品久久久久电影 | 日韩资源在线 | 九九精品在线 | 国产在线播 | 国产一区二区三区免费视频 | 国产观看| 波多野结衣av在线播放 | 国产一区二区在线播放 | 精品视频免费在线 | av看片 | 精品久久久久久亚洲精品 | 国产精品毛片久久久久久 | 成人久久久久 | 日韩欧美综合 | 成人午夜电影在线观看 | 精品专区 | 97在线视频观看 | 国产精品伦一区二区三级视频 | 日本va欧美va欧美va精品 | 国产伦精品一区二区三区免费 | 亚洲欧美日韩高清 | 成人午夜影院 | 国产精品性 | 亚洲综合三区 | 亚洲综合一区在线 | 日韩三级电影 | 黄片毛片免费看 | 综合久久久久久久 | 国产欧美精品国产国产专区 | 日韩二区三区 | 成人国产精品久久久按摩 | 成年人黄色片 | 国产永久免费 |