Installation and debugging of micro - screen hydraulic universal testing machine

    • Release time:2018-11-14 09:56:26
    • Views:3649

The installation and adjustment of micro - screen hydraulic universal testing machine is an important work. It is related to restoring the geometrical precision, the precision of indication and the service life of the machine. The work should therefore be carried out by professional staff.
The placement, installation, adjustment, watering and cementing of the test machine, connection of oil pipe, power connection, driving, test run and other work are carried out organically, and are related to each other, and each link should be taken seriously.
1. Installation conditions
The test machine should be installed in the room which is clean, dry, vibration-free and with uniform temperature, and enough maintenance space should be left around the test machine.
The main engine of the test machine shall be installed on the basis of concrete, and its size shall be determined according to the requirements of foundation drawings, wires, installation pipes and other devices. The upper plane of the foundation should be flat, straightened with a level gauge, and then installed on the testing machine after the foundation is dry.
2, installation,
2.1 the foundation engineering of the machine is constructed according to the foundation drawing.
2.2 initial alignment of the host
On the basis of the main engine, place the inclined iron and make the mounting bolt hole of the base coincide with the center of the base hole. Used in 2 groups in 4 locations.
Set the frame level in the center position above the work table (its precision is 0.05/1000) to adjust the host precision. Make it 0.1/1000.
2.3 casting and cementing of test machine foundation
2.3.1 testing machine precision alignment, the anchor nut with cement fixation, the pad iron pad underneath the stand firm, and cement base are all fill in the gap below to death, guarantee stand with good combination of cement base, prevent in use process due to vibration caused by the tester is not level, anchor nut after solid, cement dry before not tighten the anchor nut and start the machine (cement drying time is generally not less than 10-15 days). After the cement is completely dried, tighten the anchor nut and check the mounting accuracy of the test machine.
2.3.2 during the use of the test machine, due to the easy occurrence of looseness due to vibration, relevant parts should be fixed after the test machine has been used for some time.
2.4 to take over
When installing the oil pipe of the main engine, clean the oil pipe with kerosene first, and pay attention to whether the washer is complete at the joint. Oil cylinder pipe should be correctly taken over.
2.5 lubrication
The molybdenum disulfide grease can be applied on the lead screw to lubricate the lead screw and its mother. Molybdenum disulfide grease can be applied to avoid nibbling or death on sliding surface. The chain and sprocket shaft shall be regularly filled with thin grease.

濟(jì)南鉑鑒試驗機

Copyright 2010-2017 siyuan. All Right Reserved

主站蜘蛛池模板: 国产精品色综合一区二区三区 | 久久精品 | 亚洲精品在线观看网站 | 成人精品国产一区二区4080 | 欧美精品乱码久久久久久 | 欧美精品一区二区三区四区五区 | 玖玖综合九九在线看 | 欧美九九 | 中文字幕一区在线观看视频 | 久久a久久 | 国产精品一区在线播放 | 精品天堂 | 国产美女无遮挡网站 | 国产精品久久久久久吹潮 | 亚洲精品久久久久久下一站 | 亚洲国产中文字幕 | 在线一区二区视频 | 99在线免费观看视频 | 色接久久 | 欧美黄色片在线观看 | 国产成人99久久亚洲综合精品 | 久久久久久久国产精品视频 | 欧美综合在线视频 | 国产精品成人一区 | 黄色一级免费 | 国产搞逼视频 | 日韩免费视频一区二区 | 久久久久久成人精品 | 成人国产 | 精品一区中文字幕 | 国产久 | 久草在线免费福利 | 日韩在线观看网站 | 国产精品黄 | 亚洲精品一区二区三区不 | 91av视频在线观看 | 精品欧美一区二区三区精品久久 | 手机看片国产日韩 | www.国产精 | 亚洲高清在线观看 | 日韩a级毛片免费观看久久 精品一区二区在线播放 |